F-301 NCNP® - 55 GL drum

All-in-One Boiler Water Treatment
Item #20876

F-301 NCNP® - 55 GL drum

All-in-One Boiler Water Treatment
Item #20876

Need Assistance? Call us 1-800-321-8180

  • Provides conditioning of boiler water and corrosion prevention in condensate lines
  • Easy-to-test-for product tracer allows for quick and simple product level determination
  • No mixing required

Product Description

F-301 NCNP® is a complete boiler water treatment for both conditioning of boiler water and the prevention of corrosion in condensate lines, all-in-one drum. NCNP combines a powerful scale and sludge control agent with oxygen scavenger and neutralizing amines. This unique combination provides corrosion control throughout the boiler system, maximizing the life of your equipment and reducing costly maintenance. NCNP prevents energy-robbing scale and reduces boiler sludge, allowing for efficient fuel usage minimizing your energy cost.

Best of all, since NCNP contains all of the ingredients necessary in one drum, there is no need to mix chemicals, making it simple and safer to use. A single State Chemical pump can be used to feed NCNP, reducing the need for costly complex feed pumps.

NCNP is authorized by USDA for use in federally inspected meat and poultry processing plants where the treated water or steam will not contact edible products.

NCNP uses an easy to test for product tracer that allows for quick and simple product level determination.

Directions for Use

It is important to maintain both the correct level of NCNP® and the proper solids level (controlled by blowdown) for protection against scale. See your Sales Associate for proper dilution recommendations.

STEAM BOILERS: Add NCNP slowly through the vent or the opening into the condenser make-up tank or surge tank. Check pH to assure proper dosage level. Verify amount of NCNP is between 65-75 ppm with your boiler water test kit to insure that the boiler is properly protected at all times.

BLOWDOWN: To prevent scaling, blowdown should be scheduled to maintain 3-5 cycles of concentration in the boiler. Monitor cycles daily with the test kit.

HOT WATER RECIRCUL ATING BOILERS: Add treatment slowly to boiler drum or through a vent. Check pH to assure proper dosage level. Verify amount of NCNP is between 65-75 ppm by using the boiler water test kit. Maintain this level for complete protection. Blowdown unit periodically to remove sludge.

CLOSED LOOP CHILLER SYSTEMS: Verify NCNP level is between 50-60 ppm by using the boiler water test kit. Blowdown the unit periodically to remove sludge. NOTE: Submit a feedwater and boiler water sample for analysis at least twice a year to State’s Water Treatment Lab.

Product Downloads & SDS

Need Assistance? Call us 1-800-321-8180

State is an Extension of Your Team

Our customers of all sizes benefit from the best facility management products.

Team

Customized Solutions

Team

Professional Service

Team

Proven Results